Photosol is starting the construction of 10 new ground solar power plants

This new phase will bring to 250 MWp the total power operated by Photosol.

Winner at the end of 2015 of the public tender “CRE 3”, Photosol initiated this year the construction of 10 projects with an installed capacity between 4 and 12 MWp, for a total of 106 MWp. Those projects, which are spread through the French territory, especially in the departments of Allier, Nièvre and Charente, will see their construction completed by the end of 2017. It represents an additional production around 130 GWh annually, bringing the annual production of Photosol to 320 GWh annually: the consumption of an agglomeration like La Rochelle.